Prices

Storage and Treatment Plant

Price list for Waste and Substitute Building Material

Acceptance prices per ton, plus statutory VAT.

 

Recovery and disposal of soil and rubble > Z2, DK I, DK II, DK III

  • with Petroleum Hydrocarbons (TPH)

from 23.00 €

 

TPH-Content Price
≤ 5,000 mg/kg from 29.00 €
≤ 10,000 mg/kg from 37.00 €
≤ 30,000 mg/kg from 52.00 €

Other guideline values Z2 in accordance with LAGA Merkblatt M20 (2004) and guideline values DK0 in accordance with Deponieverordnung DepV apply.

 

  • with BTEX, Halog. VOC or PAH

from 23.00 €

  • with Heavy Metals

from 23.00 €


Recovery and disposal of asphalt containing coal tar

  • with PAH up to 10,000 mg/kg

from 37.50 € (milled material and pieces ≤ 30 cm)

from 40.00 € (pieces ≤ 80 cm)


We can provide you free of charge with the necessary documents regarding waste legislation (plus any official fees):

  • national – electronic verification procedure for hazardous waste
  • international – procedure of notification for waste shipment

Temporary storage of bulk material

  • including reloading of trucks with the material for further or return transport

from 4.50 € / tonne (2 weeks)


Temporary storage of containers

from 9.00 € / container (day)


Supply of building materials

Take the opportunity to take along building materials as gravel, sand, macadam and recycled building material ex works Aldenhoven on the same site!
Please contact our parent company Davids in Geilenkirchen (Tel.: +49 – (0)2451-9804-0, e-mail: franz.davids@f-davids.de).


Additional services

  • Sampling
  • Performing analyses / waste declaration
  • Excavation and loading
  • Extraction of volatile pollutants (in-situ/on-site/off-site)
  • Separation of waste components (on-site/off-site)
  • Waste shipments
  • Project management / supervision of the project
  • Verification procedure in accordance with “Verordnung über die Nachweisführung bei der Entsorgung von Abfällen – NachwV“
  • Procedure of notification for transboundary shipments of waste and substitute building material in accordance with Regulation (EC) No 1013/2006
  • and much more besides

Minimum and list prices without obligation.

Binding offers are provided on demand.